| Concrete Plant demands Denote Taleb Concrete Batching Plant Capacity 300M3 per hour
23/11/2012 - Period of Validity : 11/23/2013
Algeria
Buy Lead 5 Credit
|
| Jaw Crusher Small Jaw Crusher Machine Capacity demands. Marble Cutting Machine is required.
23/11/2012 - Period of Validity : 11/23/2013
Afghanistan
Buy Lead 5 Credit
|
| دعوات لمصنع خلط الخرسانة Readline concrete is concrete plant capacity to 300m3 per hour
10/11/2012 - Period of Validity : 11/10/2013
Afghanistan
Buy Lead 5 Credit
|
| require deburring machine cleaning and deburring machines for marble pieces are readline.
10/11/2012 - Period of Validity : 11/10/2013
Afghanistan
Buy Lead 5 Credit
|
| Construction Machinery Sells Block Paving Stone, Pipe Machinery Sells.
19/10/2012 - Period of Validity : 10/19/2013
Georgia
Sell Lead 5 Credit
|
| lightweight Mixer lightweight Mixer
04/09/2012 - Period of Validity : 09/04/2013
Turkey
Sell Lead 5 Credit
|
| Forklifts - G 25E-5 Forklifts - G 25E-5
03/09/2012 - Period of Validity : 09/03/2013
Turkey
Sell Lead 5 Credit
|
| Dump Trucks - MT 36 Dump Trucks - MT 36
03/09/2012 - Period of Validity : 09/03/2013
Turkey
Sell Lead 5 Credit
|
| Excavators - DX420LC Excavators - DX420LC
03/09/2012 - Period of Validity : 09/03/2013
Turkey
Sell Lead 5 Credit
|
| Concrete Plant demands Concrete Plant demands
18/08/2012 - Period of Validity : 08/18/2013
Libya
Buy Lead 5 Credit
|
| Demand for Asphalt Plant Asphalt Plant is readline. 80-10 t / h capacity will be.
17/08/2012 - Period of Validity : 08/17/2013
Algeria
Buy Lead 5 Credit
|
| Demand for Asphalt Plant Asphalt Plant Business Machine salesman
17/08/2012 - Period of Validity : 08/17/2013
Algeria
Buy Lead 5 Credit
|
| Demand for Asphalt Plant Asphalt plant wants to buy
17/08/2012 - Period of Validity : 08/17/2013
Algeria
Buy Lead 5 Credit
|
| Concrete Plant demands Concrete Plant demands
16/08/2012 - Period of Validity : 08/16/2013
Algeria
Buy Lead 5 Credit
|
| Demand for Asphalt Plant Company Asphalt Plant in Algeria has been requested.
16/08/2012 - Period of Validity : 08/16/2013
Algeria
Buy Lead 5 Credit
|
| Concrete Plant demands Concrete Plant demands
16/08/2012 - Period of Validity : 08/16/2013
Algeria
Buy Lead 5 Credit
|
| Concrete Plant demands Concrete Plant demands
16/08/2012 - Period of Validity : 08/16/2013
Algeria
Buy Lead 5 Credit
|
| Concrete Plant demands Concrete Plant demands
16/08/2012 - Period of Validity : 08/16/2013
Algeria
Buy Lead 5 Credit
|
| Concrete Plant demands Concrete Plant demands
16/08/2012 - Period of Validity : 08/16/2013
Algeria
Buy Lead 5 Credit
|
| Concrete Plant demands Concrete Plant demands
16/08/2012 - Period of Validity : 08/16/2013
Algeria
Buy Lead 5 Credit
|
| Concrete Plant demands Concrete Plant demands
16/08/2012 - Period of Validity : 08/16/2013
Algeria
Buy Lead 5 Credit
|
| Concrete Plant demands Concrete Plant demands
16/08/2012 - Period of Validity : 08/16/2013
Algeria
Buy Lead 5 Credit
|
| Concrete Plant demands Concrete Plant demands
16/08/2012 - Period of Validity : 08/16/2013
Algeria
Buy Lead 5 Credit
|
| Concrete Plant demands Concrete Plant demands
16/08/2012 - Period of Validity : 08/16/2013
Algeria
Buy Lead 5 Credit
|
| Concrete Plant demands Concrete Plant demands
16/08/2012 - Period of Validity : 08/16/2013
Algeria
Buy Lead 5 Credit
|
| Concrete Plant demands Concrete Plant demands
16/08/2012 - Period of Validity : 08/16/2013
Algeria
Buy Lead 5 Credit
|
| Concrete Plant demands Concrete Plant demands
16/08/2012 - Period of Validity : 08/16/2013
Algeria
Buy Lead 5 Credit
|
| Concrete Plant demands Concrete Plant demands
16/08/2012 - Period of Validity : 08/16/2013
Algeria
Buy Lead 5 Credit
|
| Concrete Plant demands Concrete Plant demands
16/08/2012 - Period of Validity : 08/16/2013
Algeria
Buy Lead 5 Credit
|
| Concrete Plant demands Concrete Plant demands
16/08/2012 - Period of Validity : 08/16/2013
Algeria
Buy Lead 5 Credit
|
| Concrete Plant demands Concrete Plant demands
16/08/2012 - Period of Validity : 08/16/2013
Algeria
Buy Lead 5 Credit
|
| Concrete Plant demands Concrete Plant demands
16/08/2012 - Period of Validity : 08/16/2013
Algeria
Buy Lead 5 Credit
|
| Concrete Plant demands Concrete Plant demands
16/08/2012 - Period of Validity : 08/16/2013
Algeria
Buy Lead 5 Credit
|
| Concrete Plant demands Concrete Plant demands
16/08/2012 - Period of Validity : 08/16/2013
Algeria
Buy Lead 5 Credit
|
| Concrete Plant demands Concrete Plant demands
16/08/2012 - Period of Validity : 08/16/2013
Algeria
Buy Lead 5 Credit
|
| BTA - 600/800 Concrete Manhole Base Machine Prefabricated chimney base machine, vibration table, chimney base internal and external molds, entry and exit pallets, fiber consists of titles and concrete bunkers transmitter. Produced by this machine bases 1000 and 1200 mm diameter concrete chimney flue pass to ensure sealing of various diameters in the direction edilir.Dört manufactured prefabricated chimney base pad input-output machines with an easy fast and economical production manufacturing technique sağlar.Vibratör table is set up in t
10/08/2012 - Period of Validity : 08/10/2013
Turkey
Sell Lead 5 Credit
|
| YBBM - 1200 Concrete Chimney Machine YBM - 1200 Concrete Chimney Flue Machine Machine YBM-1200 works on the basis of hydraulic pressure and mechanical vibration. 1000 and 1200 mm round chimney elements, 620 - 1000/620-1200mm ² conical chimney components, 800x800 / 1000 to 1000 parcels chimney elements, 620'lik tapered adapter and the valve element over ... flue machine easily produced. Chimneys made of mortar and machine is the machine by means of a rotary crane is the bunker.
10/08/2012 - Period of Validity : 08/10/2013
Turkey
Sell Lead 5 Credit
|
| BMS 1200/3600 Concrete Pipe Machines With these machines, and complies with nominal diameter coupling ended up ø500mm'den 3600mm'ye mufsuz concrete pipes, culverts four corners done on the production machines, hydraulic pressure head, internal mold platform, hydraulic unit, cooling unit, vibrator, control panel and consists of concrete bunkers transmitter . these machines, overhead bridge crane is a machine through concrete pipes are produced. Our company is available during high tonnage cranes imalatıda 5 different types of machin
10/08/2012 - Period of Validity : 08/10/2013
Turkey
Sell Lead 5 Credit
|
| Multi-Mould System Concrete Pipe Machines According to the demands of our customers, and the maximum pipe length and the maximum diameter of the pipe is detected by determining the size of the machine in a printing machine according to the daily amount which is intended to produce several pieces of pipe that produces a single, double, triple, .... is to be given. Pipe length 5.1 meters, as this series of machines up to 800mm diameter pipes hydraulic trolley types, using a triple and a single, larger diameter and the taller types of fork
10/08/2012 - Period of Validity : 08/10/2013
Turkey
Sell Lead 5 Credit
|
| Kerb Stones Pattern Kerb Stones Pattern
10/08/2012 - Period of Validity : 08/10/2013
Turkey
Sell Lead 5 Credit
|
| KPM 1036 TS-1 Full Automatic Paving Machine - Fixed single-storey production machine. - Production quality is high and chronic cycle is shorter. - External mold locking cylinders, pneumatic bellows is provided. This is because of the vibration pattern of a uniform dispersion is obtained. - Vibrator motors operated via frequency controlled speed drive. This is because of the stone produced through the control panel can be adjusted according to the type and strength of the vibration frequency. - Transfer robot products stacked on pallets sh
10/08/2012 - Period of Validity : 08/10/2013
Turkey
Sell Lead 5 Credit
|
Page 1 of 2 On Page
1 2 Next » |
Welcome
Free, Easy and Quick
Why become a member?
- Sectoral Product Review Requests from various countries
- Your company, your products and advertisements that introduce them to the world in 4 languages.
|